Runtime Investigation™
Overview
Atlas Runtime Investigation™ is a standardized investigation and organizational knowledge reuse system for robot Runtime Execution Failure (REF).
It receives Evidence Packs from Runtime Sensor Governance™ and organizes runtime evidence, historical investigation assets, engineering investigation results, and closure processes into a complete chain:
REF Intake
↓
Evidence Pack
↓
Historical RGA Recall
↓
Investigation Context
↓
Investigation Tier Candidate
↓
OEM / Sensor Investigation
↓
Investigation Result
↓
Lesson Learned
↓
Ticket Closure
↓
Assist Vault
↓
Future REF Reuse
The goal of Runtime Investigation™ is not to replace engineers, nor to automatically confirm root causes.
Its goal is to:
- Start every investigation from structured evidence
- Prioritize reuse of historical experience in every investigation
- Enable OEM and Sensor Manufacturer collaboration with unified evidence
- Transform every completed investigation into a reusable organizational asset for the future
1. What is REF?
REF is Runtime Execution Failure.
It refers to execution anomalies that occur during real robot operation, for example:
- Unexpected Stop
- Collision
- Obstacle Miss
- False Obstacle
- Localization Failure
- Path Deviation
- Fall
- Manipulation Failure
REF describes runtime events and their impacts.
REF itself does not equal root cause.
For example:
Robot suddenly stops
This is a REF.
But it may be associated with different runtime phenomena:
- LiDAR data interruption
- Camera Frame Drop
- Ethernet Link Loss
- USB Disconnect
- Driver Exit
- Linux Runtime Disturbance
- Power Event
- Application Behaviour
Atlas does not automatically determine which of these is the root cause when a REF is established.
2. REF Intake and Admission
Runtime Investigation starts from REF Intake.
Tier 1 establishes a REF Ticket based on information provided by end users, customer service, field personnel, or system alerts.
Typical inputs include:
- Incident Summary
- Customer Report
- Robot or Device ID
- Deployment Environment
- Approximate REF Time
- Incident Type Candidate
- Severity
- Runtime Evidence Availability
- Agent Upload Bundle ID
- Evidence Window ID
- Tier 1 Action
Tier 1 responsibilities are to record, confirm, and route.
Tier 1 does not need to:
- Confirm technical root cause
- Complete engineering analysis
- Determine responsibility attribution
- Write final IR or LL
Customer Report
↓
Tier 1 Intake
↓
Admission Policy
↓
Route to Tier 2
Admission Policy determines whether the event enters formal Runtime Investigation.
3. Evidence Pack as Unified Evidence Entry Point
Runtime Investigation should not start directly from massive raw logs.
Atlas uses Evidence Pack as the standard investigation input.
Evidence Pack can come from:
- Manual slicing by Tier 1 providing approximate REF time window
- Automatic generation by Agent based on Dataset Abnormal
- Automatic generation by Agent based on Cross-stream Correlation
- Controlled Event
- Known Runtime Trigger
Evidence Pack typically contains:
- Five-Window Evidence
- Runtime Timeline
- Surface Coverage
- Runtime Metadata
- Event Markers
- Integrity Information
- Raw Evidence References
- Export Manifest
Evidence Pack is an investigation evidence bundle.
It is not the final investigation conclusion.
4. Historical RGA Recall
After each REF enters investigation, Atlas prioritizes retrieval of Historical RGA, historical investigation cases.
RGA is Runtime Governance Asset.
Historical RGA can contain:
- Past REF types
- Runtime Pattern
- Investigation Path
- Excluded Path
- Investigation Result (IR)
- Lesson Learned (LL)
- Closure State
- Related Surface
- Evidence References
- Reuse Conditions
Current REF
+
Current Evidence Pack
↓
Historical RGA Recall
↓
Candidate Matches
↓
Why Retrieved
Atlas supports:
- Strong Candidate
- Partial Candidate
- Weak Candidate
- No Relevant Match
Atlas follows this principle:
Partial matches are preferred over no recall at all.
Differences in environment, devices, or versions should not be the sole reason to prevent historical asset recall.
Each recall should explain:
why_retrieved
Letting engineers understand:
- Which features match
- Which conditions differ
- Why this historical asset is still worth reviewing
Historical RGA Recall provides an investigation starting point but does not automatically copy historical conclusions to current events.
5. Investigation Context
Atlas organizes the current REF, Evidence Pack, and Historical RGA into Investigation Context.
The purpose of Investigation Context is to place information needed for investigation in the same context.
It typically includes:
- Current REF
- Incident Summary
- Five-Window Timeline
- Runtime Surface Coverage
- Observed Runtime Abnormalities
- Historical RGA Candidates
- Why Retrieved
- Known Gaps
- Investigation Questions
- Candidate Investigation Path
- Excluded Path References
REF
+
Evidence Pack
+
Historical RGA
↓
Investigation Context
Investigation Context should not contain final root causes unconfirmed by engineers.
Its goal is to help engineers quickly understand:
- What happened
- What evidence currently exists
- Which Surfaces are covered
- What information is still missing
- Whether similar situations occurred historically
- What should be prioritized for the next step
6. Investigation Tier Candidate
Atlas generates Investigation Tier Candidate based on current evidence and event scope.
It is used to suggest which tier investigation process this REF should enter.
Tier 1
Applicable to:
- Information collection
- Customer communication
- Time confirmation
- Device identification
- Evidence Availability confirmation
- Routing and escalation
Tier 1 does not complete in-depth engineering investigation.
Tier 2
Applicable to:
- Evidence Pack review
- Runtime Timeline alignment
- Historical RGA Recall
- Investigation Context establishment
- Standard Investigation Path execution
- Determining whether Tier 3 or Sensor FAE is needed
Tier 3
Applicable to:
- Cross-system complex events
- Multi-Runtime Surface correlation
- Requiring specialized engineering capability
- Standard path cannot complete
- Requiring in-depth Runtime or product engineering analysis
Sensor FAE
Applicable to:
- Sensor-specific Runtime Evidence
- Sensor Interface Investigation
- Driver or Firmware Collaboration
- Sensor Manufacturer Response
- OEM and Sensor Manufacturer joint investigation
Investigation Tier Candidate is a routing recommendation.
It is not a responsibility determination, nor a root cause determination.
Final tier is confirmed by the customer organization's Admission Policy and authorized engineers.
7. OEM Investigation Chain
OEM investigation chain typically includes Tier 1, Tier 2, and Tier 3.
Tier 1 Intake
↓
Evidence Pack
↓
Historical RGA Recall
↓
Investigation Context
↓
Tier 2 Investigation
↓
Tier 3 Escalation (if needed)
↓
OEM IR
↓
OEM LL
OEM engineering team can perform:
- Runtime Timeline Review
- Surface Coverage Review
- Historical RGA Comparison
- Investigation Path
- Excluded Path
- Additional Evidence Request
- Controlled Reproduction
- Engineering Assessment
Atlas organizes processes and assets.
Engineers are responsible for investigation decisions.
8. Sensor Manufacturer Investigation Chain
When a REF involves a Sensor Candidate, OEM can generate Sensor Engagement Pack.
OEM REF
↓
Evidence Pack
↓
Investigation Context
↓
Sensor Engagement Pack (references OEM EP)
↓
Sensor REF Ticket
↓
Sensor Investigation
↓
Sensor IR
↓
Sensor LL
↓
Sensor Response
↓
OEM Closure
Sensor Engagement Pack can include:
- Source OEM REF
- Relevant Evidence Pack References
- Relevant Five-Window Evidence
- Sensor Surface Coverage
- Runtime Timeline
- Historical Sensor RGA Candidates
- Why Retrieved
- OEM Investigation Questions
- Exchange Mode
- Data Access Boundary
Sensor Manufacturer FAE conducts investigation using unified evidence packs, rather than relying on back-and-forth screenshots and scattered logs.
9. Sensor Engagement Pack Exchange Mode
Atlas supports different evidence exchange boundaries.
Mode A: Raw Evidence Reference
Applicable when OEM authorizes Sensor Manufacturer to view specified raw evidence.
May include:
- Raw data reference
- Packet capture reference
- Frame or point-cloud reference
- Driver log reference
- Runtime timeline reference
Mode B: Signature and Recall
Applicable when raw data cannot be shared directly.
Can provide only:
- Evidence Signature
- Runtime Metadata
- Timeline Summary
- Surface Coverage
- Historical Recall Result
- Investigation Questions
Mode B can support collaboration while protecting OEM data boundaries.
10. Investigation Result (IR)
IR is Investigation Result.
IR is written by authorized OEM engineers or Sensor FAE.
IR is used to record engineering result status after investigation completion.
Typical states include:
- matched_*
- candidate_*
- not_applicable
IR can record:
- Observed Result
- Matched Pattern
- Candidate Pattern
- Evidence References
- Investigation Path Performed
- Excluded Path
- Open Questions
- Required Follow-up
IR should not automatically be written as:
- Root Cause Confirmed
- Liability Assigned
- OEM Fault
- Sensor Fault
Unless the customer's own authorization process allows it and is confirmed by their engineering team.
Atlas does not automatically generate final engineering conclusions.
11. Lesson Learned (LL)
LL is Lesson Learned.
It records engineering experience from this investigation that can be reused in the future.
LL can include:
- Steps that should be prioritized in the future
- Validated effective Investigation Path
- Directions that can be excluded
- Observation points that need to be supplemented
- Deployment configuration recommendations
- Testing or reproduction methods
- Data collection gaps
- Future Admission recommendations
LL should be written as executable steps whenever possible, rather than vague descriptions.
For example:
1. Confirm Ethernet physical link status
2. Verify IP and subnet
3. Use packet capture to verify UDP arrives
4. Check Driver process and ROS node status
5. Compare with cable or switch direct connection
LL is written by engineers.
Atlas is responsible for saving, associating, and future recall.
12. Ticket Closure
REF Ticket can only be closed after necessary investigation assets are completed.
Typical Closure Gates include:
- REF established
- Evidence Pack referenceable
- Investigation Context completed
- Required IR submitted
- Required LL submitted
- Required OEM or Sensor Response completed
- RGA generated or updated
- Closure State recorded
IR Complete
+
LL Complete
+
Required Response Complete
↓
RGA Generate / Update
↓
Ticket Closure
Ticket Closure is not simply changing status to Closed.
It represents that this investigation has formed organizational assets that can be reused in the future.
13. RGA Generation and Update
Each completed REF investigation can generate new RGA or update existing RGA.
RGA can associate:
- Source REF
- Source Evidence Pack
- Investigation Context
- OEM IR
- OEM LL
- Sensor IR
- Sensor LL
- Closure Record
- Runtime Surfaces
- Historical Pattern
- Reuse Metadata
Completed Investigation
↓
IR + LL + Evidence References
↓
RGA
↓
Assist Vault
The value of RGA is not just preserving the past.
It is used for retrieval, comparison, and investigation reuse for future REF.
14. Assist Vault
Assist Vault preserves reusable investigation assets.
It can include:
- Historical RGA
- Investigation Path
- Excluded Path
- IR
- LL
- Closure Summary
- Surface Pattern
- Evidence Signature
- Reuse Conditions
Assist Vault should not become a public pool of raw customer data.
Atlas should follow:
- Customer data ownership
- Access control
- De-identification
- Data boundary
- Export policy
- Reuse authorization
The core of sharing is not raw customer data.
The core is authorized, de-identifiable, and reusable investigation capabilities.
15. Future REF Reuse
When a new REF occurs in the future, Atlas retrieves from Assist Vault again.
New REF
↓
New Evidence Pack
↓
Historical RGA Recall
↓
Prior IR / LL Reuse
↓
Faster Investigation
Future reuse results should preserve:
- Match Level
- Why Retrieved
- Matching Dimensions
- Different Dimensions
- Reusable Investigation Path
- Non-reusable Conditions
- Engineer Review Requirement
Atlas should not automatically upgrade past conclusions to current confirmed conclusions just because historical matches are strong.
Historical assets are used to assist investigation, not replace current evidence and engineering judgment.
16. Main Outputs of Runtime Investigation
Runtime Investigation™ primarily produces the following assets:
REF Ticket
Records event, customer report, time range, severity, and routing status.
Historical RGA Match Result
Records historical candidates, match level, and why_retrieved.
Investigation Context
Unifies organization of current evidence and historical assets.
Investigation Tier Candidate
Provides investigation tier and collaboration routing recommendations.
Sensor Engagement Pack
Supports standardized evidence exchange between OEM and Sensor Manufacturer.
Investigation Result
Records authorized engineering investigation results.
Lesson Learned
Records future reusable investigation experience.
Closure Record
Records investigation closure conditions and final status.
Runtime Governance Asset
Preserves this investigation as future retrievable assets.
Assist Vault Entry
Stores authorized reusable assets in organizational knowledge base.
17. Atlas Supports
Runtime Investigation™ supports:
- REF Intake
- Admission Policy
- Historical RGA & Assist Vault pre-construction
- Evidence Pack reference
- Historical RGA Recall
- Partial Match Recall
- Why Retrieved
- Investigation Context
- Investigation Tier Candidate
- OEM Tier 1 / Tier 2 / Tier 3 Workflow
- Sensor Manufacturer FAE Workflow
- Sensor Engagement Pack
- Exchange Mode A / B
- IR / LL Artifact Management
- Ticket Closure Gate
- RGA Generation and Update
- Assist Vault
- Future REF Reuse
- Customer-controlled Data Boundary
18. Atlas Does Not Support
Runtime Investigation™ is not responsible for:
- Automatically confirming Root Cause
- Automatically confirming Causality
- Liability Assignment
- Automatically determining OEM Fault
- Automatically determining Sensor Fault
- Replacing Tier 2 or Tier 3 engineers
- Replacing Sensor FAE
- Automatically writing unconfirmed IR by engineers
- Automatically writing unconfirmed LL by engineers
- Directly copying historical conclusions as current conclusions
Atlas is responsible for:
- Organizing evidence
- Recalling history
- Building context
- Standardizing processes
- Managing investigation assets
- Supporting future reuse
19. Relationship with Runtime Sensor Governance™
Runtime Sensor Governance™ is responsible for:
Observe
↓
Persist
↓
Retain
↓
Export
↓
Evidence Pack
↓
Investigation Tier Candidate
Runtime Investigation™ is responsible for:
REF Intake
↓
Historical RGA Recall
↓
Investigation Context
↓
OEM / Sensor Investigation
↓
IR
↓
LL
↓
Ticket Closure
↓
RGA
↓
Assist Vault
↓
Future REF Reuse
The former establishes the runtime evidence foundation.
The latter transforms evidence into standard investigation processes and reusable organizational capabilities.
Summary
Atlas Runtime Investigation™ advances a Runtime Execution Failure from customer report to evidence organization, historical recall, engineering investigation, IR, LL, Ticket Closure, and future reuse.
The core closed loop it establishes is:
Every REF starts from Historical RGA
↓
Engineers complete IR and LL
↓
Every completed REF becomes a reusable RGA
↓
The next REF starts from organizational memory
Atlas does not replace engineers.
Atlas enables engineers to no longer start from scratch with infinite logs and scattered history.
Next Reading
- Atlas Agent™
- Runtime Dataset
- Evidence Pack™
- Historical RGA™
- Investigation Context
- Sensor Engagement Pack™
- Assist Vault™